Significant progress is being achieved on the [E75] Upgrading of the Road from Al Faya to Seih Shuaib Project. Today’s site activities included:
πŸ”Ή Air Release Valve Fitting Inspection – The air release valve installation was inspected to ensure correct alignment, proper sealing, and operational reliability for long-term performance.
πŸ”Ή Gate Valve Chamber Inspection – Comprehensive checks were conducted inside the chamber, covering the gate valve assembly, aluminum ladder installation, and spindle functionality, ensuring compliance with design specifications and safety standards.

πŸ”Ή Pull Box Finishing – Final finishing works on pull boxes are progressing, focusing on durability, accuracy, and accessibility for future maintenance.
πŸ”Ή Air Release Chamber Cover Slab Shuttering – Steel shuttering installation for the cover slab of the Air Release Chamber is ongoing, ensuring structural strength and proper formwork stability ahead of concrete casting.
Our dedicated team continues to work with precision and commitment to deliver high-quality infrastructure that meets both engineering and safety requirements.