Velcin Road Contracting

PROJECT DETAILS, Subgrade layer preparation and compaction work is actively progressing on site. The formation surface is being properly leveled and trimmed to meet design specifications. Moisture conditioning is carried out to achieve optimum moisture content before compaction. Layer-by-layer compaction is performed using vibratory rollers to ensure the required density and stability.

Continuous testing and quality control checks are in place to verify compaction results and confirm compliance with project standards.
This stage is vital as it provides a strong and stable foundation for the upcoming road pavement structure, ensuring long-term performance and durability.

Scroll to Top